The services of a specialist in the development of master plans are required. It is required to develop a General plan for the car scales (the territory of the Plant). It is necessary to develop a set of RD for the implementation of the CMR foundation device of new car weights and the construction of a canopy. New carbages will be built on the site of the old existing ones
In the section of the master plan, sheets are needed:
- general data
- landing plan (planning)
- relief plan
- improvement plan
In general, there should be an understanding of the bindings of new structures on the ground. On the completed topography with networks, land the entire structure of the car weighting with ramps. Show the asphalt around the car weightlifting area with heights. Show the path of movement of vehicles on both sides and possible reversals.Sections AP, KZH, KM, EM have already been developed.
Working drawings and material list for a steel yard canopy
Need working drawings, joint details and a material bill of quantities for a steel canopy in the courtyard, plus an installation scheme.
Engineering. Drawings23.09.20260197
0responses
Good to know
How do I respond to this project?
Log in as a freelancer, describe how you will solve the task, name your price and deadline. The client reads responses and starts a dialogue with the best ones.
Who can see my response?
Only the client who posted the project and you. Other freelancers do not see your text or price.