Descrizione del progetto
It is necessary to develop a set of RD for the implementation of the CMR foundation device of new car weights and the construction of a canopy.
New carbages will be built on the site of the old existing ones
In the section of the master plan, sheets are needed:
- general data
- landing plan (planning)
- relief plan
- improvement plan
In general, there should be an understanding of the bindings of new structures on the ground. On the completed topography with networks, land the entire structure of the car weighting with ramps. Show the asphalt around the car weightlifting area with heights. Show the path of movement of vehicles on both sides and possible reversals.Sections AP, KZH, KM, EM have already been developed.