The services of a specialist in the development of master plans are required. It is required to develop a General plan for the car scales (the territory of the Plant). It is necessary to develop a set of RD for the implementation of the CMR foundation device of new car weights and the construction of a canopy. New carbages will be built on the site of the old existing ones
In the section of the master plan, sheets are needed:
- general data
- landing plan (planning)
- relief plan
- improvement plan
In general, there should be an understanding of the bindings of new structures on the ground. On the completed topography with networks, land the entire structure of the car weighting with ramps. Show the asphalt around the car weightlifting area with heights. Show the path of movement of vehicles on both sides and possible reversals.Sections AP, KZH, KM, EM have already been developed.
Dibujos de trabajo y lista de materiales para un toldo de patio de acero
Necesitamos dibujos de trabajo, detalles de juntas y un presupuesto de materiales para un toldo de acero en el patio, además de un esquema de instalación.
Ingeniería. Dibujos23.09.20260197
0respuestas
Bueno saber
¿Cómo respondo a este proyecto?
Inicia sesión como freelancer, describe cómo resolverás la tarea, nombra tu precio y plazo. El cliente lee las respuestas y comienza un diálogo con las mejores.
¿Quién puede ver mi respuesta?
Solo el cliente que publicó el proyecto y tú. Otros freelancers no ven tu texto ni tu precio.