The services of a specialist in the development of master plans are required. It is required to develop a General plan for the car scales (the territory of the Plant). It is necessary to develop a set of RD for the implementation of the CMR foundation device of new car weights and the construction of a canopy. New carbages will be built on the site of the old existing ones
In the section of the master plan, sheets are needed:
- general data
- landing plan (planning)
- relief plan
- improvement plan
In general, there should be an understanding of the bindings of new structures on the ground. On the completed topography with networks, land the entire structure of the car weighting with ramps. Show the asphalt around the car weightlifting area with heights. Show the path of movement of vehicles on both sides and possible reversals.Sections AP, KZH, KM, EM have already been developed.
Dessins de travail et liste de matériaux pour un auvent de cour en acier
Besoin de dessins d'exécution, de détails de joints et d'un devis de matériaux pour un auvent en acier dans la cour, ainsi qu'un schéma d'installation.
Ingénierie. Dessins23.09.20260197
0réponses
Bon à savoir
Comment puis-je répondre à ce projet ?
Connectez-vous en tant que freelance, décrivez comment vous allez résoudre la tâche, indiquez votre prix et votre délai. Le client lit les réponses et engage un dialogue avec les meilleures.
Qui peut voir ma réponse ?
Seul le client qui a posté le projet et vous. Les autres freelances ne voient pas votre texte ou votre prix.