Project description
Scope starts with excavation of the existing cracked driveway down to a stable sub-base, then compaction and grading for proper drainage away from the garage entry. Once the base is ready, we need your recommendation on electric heating cable versus a hydronic PEX tubing loop tied to a small boiler or heat-pump manifold - please quote both options with pros, cons, and running-cost estimates for our climate zone, since we get roughly forty snow events a season.
The heating cable or tubing loops must be laid in a serpentine pattern with proper spacing per the manufacturer's layout guide, secured to mesh or fixing strips so nothing shifts during the concrete pour, and pressure or continuity tested before anything is covered. We also want a wall-mounted control panel with an aerial snow and ice sensor so the system activates automatically when precipitation and freezing temperatures are both detected, plus a manual override switch and slab sensor for monitoring.
After the embedded system passes testing, a new reinforced concrete slab will be poured over it with a broom finish matching the existing walkway, followed by proper curing time before any weight is placed on it. Please include a realistic project timeline from excavation through final cure, a materials list, and photos of at least two prior heated-driveway installations you have completed.