We have a plot outside town and this season we want to put up a small summer building of about twenty four square metres: one room as a workshop for hand tools and a bench, with a corner that will serve as a guest sleeping place in August. The walls are to be laid from clay blocks made right here, not bought and carted in. In the far corner of the plot, just under the topsoil, there is good fat loam; a heap of washed river sand is already delivered, and chopped straw comes from a neighbour after threshing. What we need is a person who has actually built this way before and is ready to lead the job from the first mix to the last coat of whitewash.

The order of work as we see it. First a test batch: several blocks with different shares of loam, sand and straw, dried and then broken by hand, so the mix is chosen by result and not by guesswork. Then moulding in wooden forms, drying on pallets under a canopy, blocks stood on edge after a few days; in open sun they crack, so the canopy is not optional. Laying starts only when a block rings dry, on mortar of the same clay and sand family. Wall thickness about forty centimetres, and that is deliberate: we want the thermal inertia, so the workshop stays cool through a July afternoon and gives the warmth back in the evening.

Two things we will not economise on. The plinth must lift the first course at least half a metre above the ground with a proper cut against capillary damp, otherwise the wall drinks water from below and the bottom courses go soft. And the roof must overhang widely on every side, so driving rain never washes the face of the wall. Plaster in two coats, a coarse one with straw and a fine finishing one, then lime whitewash. Please do not offer cement render: it locks moisture inside an earth wall and comes off in sheets, and we have no wish to redo the whole thing in two seasons.

— blocks moulded, dried and stacked on site, with a written mix ratio we can repeat;
— laying, openings for one door and two windows, a timber wall plate;
— plinth with damp proofing, roof with generous eaves on all four sides;
— earth plaster inside and out, lime whitewash as the final finish.

Timing is tied to dry weather: we plan the moulding and drying for a settled stretch, and we would rather pause the work than lay damp blocks.