Project description
• Automatic fire-fighting installations;
• Internal fire-fighting water supply;
• Smoke protection system;
• Automatic fire alarms;
• A warning and evacuation management system in case of fire;
• Automation of fire protection systems.
Three-dimensional information model of systems
Fire protection is developed on the basis of
Provided by the Designer General
Three-dimensional information model of the building. Produce
Linking firefighting systems to other
Engineering systems and architectural
Planning and constructive solutions of the building.
The area of the reconstruction object is 24000 m.sq.
The BIM project execution regulation is sent separately