24FreelanceFreelance marketplace that never sleeps
Freelancer Available for work

Igor

Engineering.
100 ratingon the platform since 2017Ukrainelast seen 07.11.2017
Portfolio
0
services: 0
Responses to projects
0
actions in 12 months: 0
Positive reviews
—
No reviews yet
Views
0
of works and posts, 30 days

About me

I do the following:
1 Master plans
Stage P (Explanatory Note ROM and drawings) according to the resolution No. 87 "Scheme of planning organization of the land plot" .
Stage R
(Drawings of the GP, GT)
1. General data on working drawings
2. Breakdown plan
3. Landscape management plan
4. Earth-mass plan
5. Consolidated plan of engineering networks
6. Land improvement plan

2 Roads
Stage P (By Resolution No. 87)
1. Section 1. Explanatory memorandum (PO)
2. Section 2. Draft withdrawal lane (BRL)
3. Section 3. Technological and constructive solutions of a linear object. Artificial structures (TCR)
- Scheme of placement of road signs, application of markings with the statements of volumes of work, or development of a full project of road traffic organization (ROS).
Stage R
(Drawings of the AD mark)
- general data on working drawings;
- road plan;
- a breakout plan (if necessary);
- Consolidated plan of engineering networks (if necessary);
- relief plan;
- plan of earth masses (if necessary);
- the longitudinal profile of the road;
- longitudinal profiles of drainage and mountain ditches (if necessary);
- characteristic transverse profiles of the earth web;
- cross profile of road clothing design;
- cross-sectional profiles of the road;
- the scheme of location of technical means of road traffic organization;
- road improvement plan (if necessary);
- calculation of the design of road clothes;
- volume statements;
- specifications.

3 Railways
Stage P (By Resolution No. 87)
1. Section 1. Explanatory memorandum (PO)
2. Section 2. Draft withdrawal lane (BRL)
3. Section 3. Technological and constructive solutions of a linear object. Artificial structures (TCR)
- calculation of the rail elevation;
- traction crew
- organization of movement of the non-public use path, station.
Stage R
(PJ stamp drawings)
General data on working drawings;
- the plan of the railway track(s);
- longitudinal profile of the main railway track(s);
- a plan of the path development of separate points;
- longitudinal profile for drainage facilities (canavas, ditches, drainages, trays, etc.);
- transverse profile of the earthbed of the railway track (paths).
The number of plans, longitudinal and transverse profiles is determined based on the specifics of the projected object or indicated by the customer.
- volume statements;
- specifications;
calculations (traction, rail elevations, etc., if necessary)

Skills 2

Personal qualities

Good to know
How do I order work from Igor?

Send a message with the task, deadline and budget, or post a project and invite the freelancer. Check the portfolio and reviews to make sure the experience fits your task.

How does the secure deal work?

The client reserves the payment on the platform before work starts; the freelancer receives it after the result is accepted. Keep the discussion in site messages — it protects both sides in a dispute.

What is the rating and the “Top of the week”?

The rating grows with activity and positive reviews and drops after complaints. The “Top of the week” is a daily leaderboard of the ten most active freelancers over the last seven days.

What this page answers