It is required to implement a diploma project on the topic: "Reconstruction of the heating system of CJSC Cherepovets Match Factory FESCO" Reconstruction of the heating system is carried out with the maximum Preserving existing communications and changing heat source. That is, the heating system is disconnected from the water heating system. boiler and connects to a heat station connected to the steam boiler room. The project of reconstruction of the heating system of CJSC Cherepovets match factory FESCO shall be executed in the following sequence: - determination of heat expenditure; - Selection of the scheme of grid water heaters, thermal and hydraulic calculations heater; - calculation of the calibration hydraulic regime of the heat supply system - selection of network pumps; - selection of equipment of the central heat station
Corrimão forjado para uma escada de casa e uma varanda
Eu preciso de um corrimão forjado para a escada da minha casa e um corrimão pequeno correspondente para a varanda: um esboço desenhado para esta casa, motivos de plantas contidos,…
Linha de louças de cerâmica artesanal para um café com 20 lugares
Estamos abrindo uma cafeteria com vinte lugares e procurando um estúdio: quarenta xícaras em dois volumes com pires, trinta pratos de sobremesa e grandes travessas de servir — uma…
120 caixas de presente de madeira compensada: corte, tampa gravada, bandeja ajustada
Uma produção de 120 caixas de compensado de cerca de 30x20x10 cm para conjuntos de presentes corporativos: tampa articulada ou deslizante, logotipo gravado, uma bandeja adaptada pa…
Outros / Diversos20.09.20260234
0respostas
Bom saber
Como respondo a este projeto?
Faça login como freelancer, descreva como você resolverá a tarefa, nomeie seu preço e prazo. O cliente lê as respostas e inicia um diálogo com as melhores.
Quem pode ver minha resposta?
Apenas o cliente que postou o projeto e você. Outros freelancers não veem seu texto ou preço.