It is required to implement a diploma project on the topic: "Reconstruction of the heating system of CJSC Cherepovets Match Factory FESCO" Reconstruction of the heating system is carried out with the maximum Preserving existing communications and changing heat source. That is, the heating system is disconnected from the water heating system. boiler and connects to a heat station connected to the steam boiler room. The project of reconstruction of the heating system of CJSC Cherepovets match factory FESCO shall be executed in the following sequence: - determination of heat expenditure; - Selection of the scheme of grid water heaters, thermal and hydraulic calculations heater; - calculation of the calibration hydraulic regime of the heat supply system - selection of network pumps; - selection of equipment of the central heat station
Barandilla forjada para una escalera de casa y un porche
Necesito un pasamanos forjado para la escalera de mi casa y un pasamanos pequeño a juego para el porche: un boceto dibujado para esta casa, motivos de plantas sobrios, un pasamanos…
Línea de vajilla de cerámica hecha a mano para una cafetería de 20 asientos
Estamos abriendo una cafetería de veinte asientos y buscando un estudio: cuarenta tazas en dos volúmenes con platos de saucer, treinta platos de postre y grandes bandejas de servir…
Panel de mosaico de vidrio para la pared de una piscina interior, 2 x 1.5 m
Se busca: un panel de mosaico de aproximadamente 2 x 1.5 m para la pared final desnuda de nuestra piscina cubierta. Motivo marino sin peces de dibujos animados, azulejo de vidrio c…
Otros / Varios20.09.20260190
0respuestas
Bueno saber
¿Cómo respondo a este proyecto?
Inicia sesión como freelancer, describe cómo resolverás la tarea, nombra tu precio y plazo. El cliente lee las respuestas y comienza un diálogo con las mejores.
¿Quién puede ver mi respuesta?
Solo el cliente que publicó el proyecto y tú. Otros freelancers no ven tu texto ni tu precio.