Development of the EP section on 110/35/10 kVEngineering. DrawingsIt is required to perform a complete reworking of the EP (electric substation) section for the 110 kV PS due to changes in the composition of the equipment. In addition, it will be necessary to: *Recalculation of short currents ...Mar 29, 2019More
LightshopEngineering. DrawingsThe services of a designer are required. It is necessary to do: (1) The measurement plan of the premises; (2) Dismantling non-bearing walls and partitions; (3) The plan of the walls being erected ...Mar 29, 2019More
We need a Basis 8 teacher.Engineering. DrawingsTraining in the Basis 8 program. We need a good teacher on Basis 8.Mar 29, 2019More
Designers requiredEngineering. DrawingsClosedThe Russian production company invites designers who use pressure and level sensors in their projects to cooperate. We suggest that we...Mar 29, 2019More
Designing a sandwich panel shopEngineering. DrawingsThe building spot is approximately 10x12 m., floor height is 3 m, two floors, the roof is flat. Technologist's mission is in place. The foundation is tape, metal frame, entrance tambour-appendix. Section AR with colored...Mar 28, 2019More
Preparation of projects of houses for the siteEngineering. DrawingsPreparation is required for placing on the website of the construction company projects of houses (floor plans, 4 facades and visualization).Mar 27, 2019More
Make a pattern of laser grassEngineering. DrawingsYou need to make a pattern for 1 m2. Idea in file. This product will be used to decorate the balloon case. A mirror image to save material...Mar 25, 2019More
Calculation of the scheme with a detailed descriptionEngineering. DrawingsThe scheme with power 28V for load reservation is given, it is necessary to select the elements of the scheme experimentally and describe its operation in detail.Mar 24, 2019More
The project of the Temple with a bell tower (Otopl, Vent, Kondits, ITP)Engineering. DrawingsClosedThe building of the temple is a three-storey (including the ground floor) Square of 4800 m2. The capacity of the building is 1000 people. Building belfry - three-storey with basement floor; Area 500 m2 We need to design sections...Mar 23, 2019More
AR. Manufacture of plastic products (clean place.)Engineering. DrawingsAn architect is required to develop RD for the production of plastic products. Clean rooms are Class C/D. Experience with similar facilities is mandatory. It is necessary to provide a portfolio for...Mar 23, 2019More
Develop a 3D model of furnitureEngineering. DrawingsWe need a 3D modeling specialist. It requires the development of a 3D model, a map of the opening of the...Mar 22, 2019More
Developing technological equipmentEngineering. DrawingsIt is required to develop a technological tooling for spatial trimming of plastic panels of various configurations (workpiece - vacuum-formed panel). There is an example of such a slip,Mar 22, 2019More
Reengineering PPEngineering. DrawingsPP reverse engineering. Removal of the electrical circuit board, preparation of the CD for the printed circuit board, including the assembly drawing and preparation of files for production.Mar 21, 2019More
Technologist. Clean roomsEngineering. DrawingsA technologist is required to develop RD for the production of plastic products. Clean rooms are Class C/D. Experience with similar facilities is mandatory. It is necessary to provide a portfolio for this...Mar 20, 2019More
Re-draw the project OB from 2d to 3dEngineering. DrawingsThere is a project of systems OH made in AutoCAD in 2d format. Requires to redraw the project in AutoCAD MEP in 3D format.Mar 17, 2019More
Make a 2D model of the product with dimensionsEngineering. DrawingsMake a 2D model of the product with dimensions. From the picture. Simply put, we will provide just a picture (sofa or chair) and you draw it with dimensions.Mar 17, 2019More