Development of the EP section on 110/35/10 kV

Employer
[no-member:pro]Evgeny[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Mar 29, 2019 until Apr 5, 2019
Project description
It is required to perform a complete reworking of the EP (electric substation) section for the 110 kV PS due to changes in the composition of the equipment. In addition, it will be necessary to:
*Recalculation of short circuit currents in the network 10 kV, 35 kV, 0.4 kV
*Recalculation and selection of 0.4 kV automatic switches, 0.4 kV cable products
*Testing the TSN for permissible load
* Recalculation of the CBR capacity
*Recalculation of equipment parameters 10 kV (according to KZ currents, shock currents.)
*Recalculation of lightning protection zones
*Recalculation of ground resistance
*Recalculation of maximum working currents of connections of 35 kV
Planned start date: early March
Planned duration of work: 3 weeks
Information on the project is currently being collected.
The contractor will also be required to participate in the procedure for the approval of equipment offered by the supplier.
Note: The RD stage is being developed.
*Recalculation of short circuit currents in the network 10 kV, 35 kV, 0.4 kV
*Recalculation and selection of 0.4 kV automatic switches, 0.4 kV cable products
*Testing the TSN for permissible load
* Recalculation of the CBR capacity
*Recalculation of equipment parameters 10 kV (according to KZ currents, shock currents.)
*Recalculation of lightning protection zones
*Recalculation of ground resistance
*Recalculation of maximum working currents of connections of 35 kV
Planned start date: early March
Planned duration of work: 3 weeks
Information on the project is currently being collected.
The contractor will also be required to participate in the procedure for the approval of equipment offered by the supplier.
Note: The RD stage is being developed.