Responses acceptedResponse period is overuntil 26.02.2024
Responses0category average: 0.2
Views62310 in 14 days
Project description
Offering extra earnings. For equipment listed in Table 1 and PLC, the configuration of which is shown in Table 2 in the Eplan 2.8 program is necessary in accordance with the current GOSTs: (1) develop an electrical diagram of the cabinet and the connection of external wiring; (2) select an electric box and arrange the equipment therein; (3) to trace the wires in the cupboard; 4) to create an overview of the electrocafe model (scanning of all faces (doors, side walls and mounting panel) with the indication of dimensions) - Pro Panel; 5) create reports: cable log, specification (GOST), table of connections and connections.
Working drawings and material list for a steel yard canopy
Need working drawings, joint details and a material bill of quantities for a steel canopy in the courtyard, plus an installation scheme.
Engineering. Drawings23.09.20260196
0responses
Good to know
How do I respond to this project?
Log in as a freelancer, describe how you will solve the task, name your price and deadline. The client reads responses and starts a dialogue with the best ones.
Who can see my response?
Only the client who posted the project and you. Other freelancers do not see your text or price.