Project description
1.Section of Foundations and Foundations
Calculate and draw (2 sheets A1) 2 versions of the foundations
Geology and markings.
2. Technology and organization of construction
Develop a technological map for the installation of load-bearing console farms of the building.Develop a calendar schedule, a stogenplan for the above-ground part. (3 sheets A1)
3.Estimates
Determine the estimated cost for above-ground work by the resource method.
There are prices for the region.