Responses acceptedResponse period is overuntil 05.04.2019
Project description
It is required to perform a complete reworking of the EP (electric substation) section for the 110 kV PS due to changes in the composition of the equipment. In addition, it will be necessary to: *Recalculation of short circuit currents in the network 10 kV, 35 kV, 0.4 kV *Recalculation and selection of 0.4 kV automatic switches, 0.4 kV cable products *Testing the TSN for permissible load * Recalculation of the CBR capacity *Recalculation of equipment parameters 10 kV (according to KZ currents, shock currents.) *Recalculation of lightning protection zones *Recalculation of ground resistance *Recalculation of maximum working currents of connections of 35 kV
Planned start date: early March Planned duration of work: 3 weeks
Information on the project is currently being collected.
The contractor will also be required to participate in the procedure for the approval of equipment offered by the supplier. Note: The RD stage is being developed.
Working drawings and material list for a steel yard canopy
Need working drawings, joint details and a material bill of quantities for a steel canopy in the courtyard, plus an installation scheme.
Engineering. Drawings23.09.20260197
0responses
Good to know
How do I respond to this project?
Log in as a freelancer, describe how you will solve the task, name your price and deadline. The client reads responses and starts a dialogue with the best ones.
Who can see my response?
Only the client who posted the project and you. Other freelancers do not see your text or price.