Project description
22 pdf section ventilation all work only on ventilation and air conditioning (k1-k5)
1. On each sheet separately leave on 1 system, PE1, P1, P2, P3, VE1, VE2, VE3, VE4, B1, B2, B3
2. remove everything except walls, wall sizes, grille sizes,
3. Remove in 1 pom partition with doors and valve "bug" on the inflow and hood
4 to apply dimensions from axes to walls and partitions on each system (I will send out tomorrow)
5. the same with air conditioners separately on the sheet with dimensions.
6. Another scheme of the room with indication of the placement of control panels (send later) there is simple.
Files need to be in the carcad and PDF resolution so that you can insert into the ward without loss of quality.
All this is necessary for the certification of ventilation.