Vladimir
About me
1. Development of technical specifications;
2. Implementation of the design stages:
3. "Project", "Working Project", "Working Documentation",
4. "Executive documentation", "Inspection of objects";
5. Coordination with other supervisory authorities, coordination with subcontractors, if necessary, participation in meetings with the Customer;
6. Adjustment of other (foreign) projects performed;
7. Consultations, references on sections and systems, evaluation of cost and design time;
Independent design of sections and systems:
1. “General Explanatory Note” (for stage “P”);
2. Technological solutions (except for large production facilities)
3. "Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with energy resources metering devices" (EE);
4. Project of organization of works on demolition or dismantling of the capital construction object (AML);
5. List of environmental protection measures (PM JFO);
6. Requirements for ensuring safe operation of capital construction object (TBE);
7. “Construction organization project” (POS);
8. “Project of Work” (PPR);
9. Technological regulations of the process of waste management of construction and demolition (TR);
10. Anti-terrorist protection of facilities;
11. For linear objects of engineering communications (POS, PM JFO, PPR);
12. Communications networks:
Automatic fire alarm system (SS) ;
Fire alerting and evacuation management system (ESMS);
Automation of smoke ventilation systems (SVVS);
- Automatic fire extinguishing systems (ASPT);
Access control and management system (ACS);
- Security alarm system (SATS);
- Television surveillance system (SOT);
- Chamber alarm system (ATP);
- Inspection systems (SS);
- Anti-theft systems (PCS);
- Parking management system (PMS);
- City Security System (SSSA)
- System of cable reception of television (SKMT);
- Videoconferencing system (SVCS);
- Electronic queue system (SEA);
- Wireless broadcasting (radio) system (SPV);
Structured Cable Network (SCS)
Local area network (LAN)
- Data transmission system (DSP);
- Hours system (HF);
- System of monitoring of engineering systems (SMIS, SMIC, SUKS);
- Automated dispatching system of engineering equipment (ASUD);
- Automated Energy Consumption Accounting and Control System (ASUCE);
- Outdoor communication networks (NSNs);
- Linear objects of section "SS";
No works have been added yet.
The freelancer has not added ready-made offers — message them with your task.
ServicesReviews appear after cooperation through the site: a recommendation raises the rating, a complaint lowers it.
ReviewsHow do I order work from Vladimir?
Send a message with the task, deadline and budget, or post a project and invite the freelancer. Check the portfolio and reviews to make sure the experience fits your task.
How does the secure deal work?
The client reserves the payment on the platform before work starts; the freelancer receives it after the result is accepted. Keep the discussion in site messages — it protects both sides in a dispute.
What is the rating and the “Top of the week”?
The rating grows with activity and positive reviews and drops after complaints. The “Top of the week” is a daily leaderboard of the ten most active freelancers over the last seven days.