Open
Preparation of estimates for EC
A surveyor is required. Estimated documentation for the ML and CM sections should be carried out. The CM and CM documentation has already been done.
Engineering. Drawings24.07.20210458
Daily views of the client’s projects and articles.
A surveyor is required. Estimated documentation for the ML and CM sections should be carried out. The CM and CM documentation has already been done.
Reviews appear after cooperation through the site: a recommendation raises the rating, a complaint lowers it.
ReviewsLook at how many projects the client has published and completed and read the freelancers’ reviews. In the response, show a similar work and name a price and deadline.
The client reserves the payment on the platform before work starts; the freelancer receives it after the result is accepted. Keep the discussion in site messages — it protects both sides in a dispute.