Closed
Working and project documentation, sections AR, CR, VC and IRA, PIC
For technical re-equipment of the CTP, including repair of premises with replacement of windows, doors, plumbing, painting of walls, installation of filling floors, repair of...
Engineering. Drawings06.08.201832,475