Good afternoon!
A surveyor is required. It is necessary to translate the estimate under the section "automatic fire extinguishing installation" into current prices. Estimates are compiled in FERs in 2000 prices.
It is necessary:
1. Transfer it to current prices.
2. In the form of a certificate, separate the CMP from materials and equipment.
3. Upload the specification for materials for distribution to suppliers.
A surveyor is required. It is necessary to translate the estimate under the section "automatic fire extinguishing installation" into current prices. Estimates are compiled in FERs in 2000 prices.
It is necessary:
1. Transfer it to current prices.
2. In the form of a certificate, separate the CMP from materials and equipment.