Ventilation

Employer
[no-member:pro]Andrey[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Mar 9, 2019 until Mar 13, 2019
Project description
Good day to start by evaluating the amount you need:
22 pdf section ventilation all work only on ventilation and air conditioning (k1-k5)
1. On each sheet separately leave on 1 system, PE1, P1, P2, P3, VE1, VE2, VE3, VE4, B1, B2, B3
2. remove everything except walls, wall sizes, grille sizes,
3. Remove in 1 pom partition with doors and valve "bug" on the inflow and hood
4 to apply dimensions from axes to walls and partitions on each system (I will send out tomorrow)
5. the same with air conditioners separately on the sheet with dimensions.
6. Another scheme of the room with indication of the placement of control panels (send later) there is simple.
Files need to be in the carcad and PDF resolution so that you can insert into the ward without loss of quality.
All this is necessary for the certification of ventilation.
22 pdf section ventilation all work only on ventilation and air conditioning (k1-k5)
1. On each sheet separately leave on 1 system, PE1, P1, P2, P3, VE1, VE2, VE3, VE4, B1, B2, B3
2. remove everything except walls, wall sizes, grille sizes,
3. Remove in 1 pom partition with doors and valve "bug" on the inflow and hood
4 to apply dimensions from axes to walls and partitions on each system (I will send out tomorrow)
5. the same with air conditioners separately on the sheet with dimensions.
6. Another scheme of the room with indication of the placement of control panels (send later) there is simple.
Files need to be in the carcad and PDF resolution so that you can insert into the ward without loss of quality.
All this is necessary for the certification of ventilation.