Interface board

Employer
[no-member:pro]Denis[/no-member:pro]
Project parameters
Type of cooperationPeriodic employment
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Jan 31, 2019 until Feb 10, 2019
Project description
Creation of documentation (P-CAD) for manufacturing (D) Moscow) interface boards (2 pcs.).
Attached dimensional drawings (AutoCad, approximate), sizing and a list of components (buy ourselves).
You're just a drinker.
The production time of drawings is 5 working days.
Attached dimensional drawings (AutoCad, approximate), sizing and a list of components (buy ourselves).
You're just a drinker.
The production time of drawings is 5 working days.