Develop a project for the production of the building

Employer
EvgenyEvgeny
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash
Acceptance of requestsclosed
Project description
It is necessary to develop a project for the production of the building. Dimensions 60*15
3 floors with the production of winter concrete by type of structures.
3 floors with the production of winter concrete by type of structures.