Project description
1. General statement of materials, including waste and minimization.
2.1 Foundation plan (type of foundation with reference to the axes of the house)
Location of the beam (if present) or other beam-bound linkage to the axles of the house and with the marking of the height mark (e.g. lower plane of the beam 0.000)
3. Location of the 1st floor floor floor floor with bindings, step and increase of necessary elements + specification or cross-section designation
4. Shield plan (section of assembled shields in the horizontal plane) with drawing of the nodes of the connection of the shields + designation of the shields (for further comparison of the sweep of the shields with their location)
Example of shield designation B/1-3 or similar designation
Where B is the axis of the house in which the shield is located
1-3 - axes of the house between which there is a shield, and when the observer is spatially oriented, we assume that the axis 1 on the left and the axis 3 on the right
5. Drawings of shields with the required dimensions
+ heights at the bottom of the shield and at the top, taking into account the double tying
+ designation of the shield according to the plan of the shields
+ symbol of the second upper bandage
+ cross-section of the rigs and racks in the drawing (for understanding the device of such)
6. Plan of the second upper binding of the shields with overlap with respect to the first upper.
7. Subsequent sheets of upper floors overlap, shields, etc. Duplicate information content of the 1st floor.
Plan of the truss system with indication of the required dimensions, cuts
specification or indication of the required sections.
8.2 Roof plan with indication of dimensions, overhangs, areas of stingrays, corners.
Plan of the crate with the designation of the step and cross-section of the crate.
8.4 Drawing of the roof cake (if necessary).
8.5 In the case of a complex roof, it is mandatory to increase all the responsible units with the indication of the material cross-section.
9. On each sheet (sheets, shields, roofing) a summary statement of material is required.
Project author: Denis