24FreelanceMercato freelance che non dorme mai
Chiuso

OLV

1 480 visualizzazioni 3 risposte#7532
Stato del progetto
Closed
Budget€3 225per il progetto
FormatoProgetto una tantumnessun prepagamento
PagamentoBonifico bancario
Risposte accettateFinitofino a 20.08.2017
Risposte3media della categoria: 1,3
Visualizzazioni1 48014 in 14 giorni

Descrizione del progetto

Points of connection of water supply system to networks to accept wells on the main networks according to the attached scheme. Pressure in the main networks 4-4.5 kgsq.cm. The pipeline from the points of connection to the main pipeline to the metering device is laid from polymer (plastic) pipes.
Connection points of the sewerage system take wells, according to the attached scheme. The project provides for the installation of a filtered water metering device. The metering device must be included in the State Register of Measurements. The type of metering device is determined by the project. Project documentation for the accounting node should be developed in accordance with the current SNIP. When designing a water supply system, provide for measures to ensure compliance with fire safety and the filing of estimated water costs for fire extinguishing.
To receive storm and surface runoff, take storm wells, according to the attached scheme.
The quality of storm and wastewater discharged into the sewerage system should comply with existing norms and regulations.
The water supply system project should be developed in accordance with the SNiP.
Provide a system of household water supply in accordance with the current standards SNiP 2.04.01-85*, SNiP 3.05.01-85, VSN 01-89.
The estimated costs of cold water are determined in accordance with SNiP 2.04.01-85*.
At the input, provide filters for trapping mechanical impurities.
Pipelines of cold water (vertical and horizontal) must be provided from metal pipes (steel with a reliable corrosion-resistant coating of the outer surface) with insulation of the Energoflex type.
Provide for the installation of cold water meters at the input of the water supply in the building and to each consumer, according to the layouts.
Designing water metering units should be carried out in accordance with SNiP 2.04.01-85*.
Provide a system of household sewerage in accordance with the current standards of SNiP 2.04.01-85*, SNiP 3.05.01-85, VSN 01-89.
Pipelines for sewerage systems (racks, floor wiring) should be made of polymer pipes with fire clutches installed on them in the passageways through interfloor ceilings.
Provide an internal drainage system in accordance with the current norms of SNiP 2.04.01-85*.The drainage network pipe is provided from metal pipes (steel with reliable anti-corrosion coating of the outer surface) with insulation.
Provide installation of the electric heating system of the sinkholes of the roof of the building.
The quality of cold water supplied for household purposes should correspond to SanPiN 2.1.4.559-96. Provide filters for trapping mechanical impurities.
If necessary, provide for the installation of an automatic fire pumping station.

Provide a fire-fighting water supply in accordance with the current standards SNiP 2.04.01-85*, NPB-88-01, NPB-110-03.
Altro / Varie Bonifico bancario

Protezione escrow SafeDeal

I fondi sono bloccati in escrow Payora USDT (TRC-20) e rilasciati al professionista solo dopo l’approvazione della consegna.

24
Venti · consiglio

Come scrivere una risposta che venga scelta

  • Inizia con il compito del cliente, non con una storia su di te.
  • Collega uno o due lavori simili dal tuo portfolio.
  • Indica un prezzo e una scadenza — e cosa includono esattamente.
  • Fai una domanda di chiarimento: inizia la conversazione.

Risposte 3

I testi delle risposte sono visibili solo al cliente.

Stessa categoria

Progetti simili

Tutti i progetti nella categoria
Ringhiera forgiata per una scala di casa e un portico

Ringhiera forgiata per una scala di casa e un portico

Ho bisogno di un parapetto in ferro battuto per la scala della mia casa e di un piccolo parapetto abbinato per il portico: un disegno realizzato per questa casa, motivi vegetali so…

Altro / Varie23.09.20260233
0risposte
Buono a sapersi
Come rispondo a questo progetto?

Accedi come freelancer, descrivi come risolverai il compito, indica il tuo prezzo e la scadenza. Il cliente legge le risposte e inizia un dialogo con le migliori.

Chi può vedere la mia risposta?

Solo il cliente che ha pubblicato il progetto e tu. Altri freelancer non vedono il tuo testo o prezzo.

Dove posso trovare lavori simili?

Nuovi progetti in “Altro / Varie” appaiono ogni giorno. Tutti i progetti nella categoria

Cosa risponde questa pagina