项目描述

Points of connection of water supply system to networks to accept wells on the main networks according to the attached scheme. Pressure in the main networks 4-4.5 kgsq.cm. The pipeline from the points of connection to the main pipeline to the metering device is laid from polymer (plastic) pipes.
Connection points of the sewerage system take wells, according to the attached scheme. The project provides for the installation of a filtered water metering device. The metering device must be included in the State Register of Measurements. The type of metering device is determined by the project. Project documentation for the accounting node should be developed in accordance with the current SNIP. When designing a water supply system, provide for measures to ensure compliance with fire safety and the filing of estimated water costs for fire extinguishing.
To receive storm and surface runoff, take storm wells, according to the attached scheme.
The quality of storm and wastewater discharged into the sewerage system should comply with existing norms and regulations.
The water supply system project should be developed in accordance with the SNiP.
Provide a system of household water supply in accordance with the current standards SNiP 2.04.01-85*, SNiP 3.05.01-85, VSN 01-89.
The estimated costs of cold water are determined in accordance with SNiP 2.04.01-85*.
At the input, provide filters for trapping mechanical impurities.
Pipelines of cold water (vertical and horizontal) must be provided from metal pipes (steel with a reliable corrosion-resistant coating of the outer surface) with insulation of the Energoflex type.
Provide for the installation of cold water meters at the input of the water supply in the building and to each consumer, according to the layouts.
Designing water metering units should be carried out in accordance with SNiP 2.04.01-85*.
Provide a system of household sewerage in accordance with the current standards of SNiP 2.04.01-85*, SNiP 3.05.01-85, VSN 01-89.
Pipelines for sewerage systems (racks, floor wiring) should be made of polymer pipes with fire clutches installed on them in the passageways through interfloor ceilings.
Provide an internal drainage system in accordance with the current norms of SNiP 2.04.01-85*.The drainage network pipe is provided from metal pipes (steel with reliable anti-corrosion coating of the outer surface) with insulation.
Provide installation of the electric heating system of the sinkholes of the roof of the building.
The quality of cold water supplied for household purposes should correspond to SanPiN 2.1.4.559-96. Provide filters for trapping mechanical impurities.
If necessary, provide for the installation of an automatic fire pumping station.

Provide a fire-fighting water supply in accordance with the current standards SNiP 2.04.01-85*, NPB-88-01, NPB-110-03.
其他 / 杂项 银行转账

SafeDeal 担保交易保护

资金锁定在 Payora USDT (TRC-20) 托管账户中,仅在确认验收作品后才会释放给自由职业者。

24
二十 · 提示

如何写出被选中的回复

  • 以客户的任务开头,而不是讲述自己的故事。
  • 链接一到两个来自您作品集的类似作品。
  • 给出一个价格和截止日期——以及它们具体包括什么。
  • 问一个澄清问题:这可以开始对话。

回复 3

回复文本仅对客户可见。

同类类别

类似项目

该类别中的所有项目
交钥匙办公室视频监控安装

交钥匙办公室视频监控安装

我们需要一个办公室视频监控安装:摄像头选择、布线、录制和远程访问设置。

其他 / 杂项24.09.20260234
0回复
为房屋楼梯和门廊锻造的栏杆

为房屋楼梯和门廊锻造的栏杆

我需要一个为我家楼梯定制的锻铁扶手,以及一个与之匹配的小扶手用于门廊:为这座房子绘制的草图,简约的植物图案,舒适的扶手,古铜色的表面处理和整洁的安装。

其他 / 杂项23.09.20260233
0回复
为20个座位的咖啡店设计的手工陶瓷餐具系列

为20个座位的咖啡店设计的手工陶瓷餐具系列

我们正在开设一家二十个座位的咖啡店,并寻找一个工作室:四十个杯子分为两种容量,配有碟子,三十个甜点盘和几个大托盘——一个系列,一个平静的缎面釉。

其他 / 杂项20.09.20260244
0回复
120个胶合板礼品盒:切割、雕刻盖、配套托盘

120个胶合板礼品盒:切割、雕刻盖、配套托盘

一批120个胶合板箱,尺寸约为30x20x10厘米,用于企业礼品套装:铰链或滑动盖,雕刻的标志,适合三件物品的托盘,安静的油漆或染色饰面,以及一个锁扣。

其他 / 杂项20.09.20260233
0回复
值得注意
我该如何回应这个项目?

以自由职业者身份登录,描述您将如何解决任务,命名您的价格和截止日期。客户会阅读回复并与最佳的进行对话。

谁能看到我的回复?

只有发布项目的客户和您自己。其他自由职业者无法看到您的文本或价格。

我在哪里可以找到类似的工作?

在“其他 / 杂项”中每天都有新项目出现。 该类别中的所有项目

此页面回答的问题