Development of the draft withdrawal lane

Эндрю
2

Эндрю

no recommendations
no complaints
Closed
Project title: Development of the draft withdrawal lane
Type of cooperation: Periodic employment
Section: Other / Miscellaneous
Prepayment: prepayment is possible
Acceptance of requests: closed

Project description:
Develop an APO

1. Object: household in 2 branches (length 1.8 km) and storm sewerage in 2 branches (0.8 km). They are laid mainly by the method of HNB (horizontal-directional drilling).
2. There's a longitudinal TCR.
3. There's OC, there's PD.
Project author
Эндрю