Skip to content

Development of the draft withdrawal lane

Endryu
Employer

EndryuEndryu

2 projects
Closed
Project parameters
Type of cooperationPeriodic employment
Prepaymentprepayment is possible
Acceptance of requestsclosed
Project description
Develop an APO

1. Object: household in 2 branches (length 1.8 km) and storm sewerage in 2 branches (0.8 km). They are laid mainly by the method of HNB (horizontal-directional drilling).
2. There's a longitudinal TCR.
3. There's OC, there's PD.
Project author: Endryu