
1
Максим
no recommendations
no complaints
Closed
Project title: Executive schemes required
Type of cooperation: Periodic employment
Section: Other / Miscellaneous
Prepayment: without prepayment
Payment methods: Cash
Acceptance of requests: closed
Type of cooperation: Periodic employment
Section: Other / Miscellaneous
Prepayment: without prepayment
Payment methods: Cash
Acceptance of requests: closed
Project description:
Implementation of executive schemes based on the project is required.
Control measurements of the geometry of the structure.
Removal of defecation and construction overlay
Implementation of executive schemes based on the project is required.
Control measurements of the geometry of the structure.
Removal of defecation and construction overlay