Executive schemes required

Employer
[no-member:pro]Maksim[/no-member:pro]Maksim
Project parameters
Type of cooperationPeriodic employment
SectionOther / Miscellaneous
Prepaymentwithout prepayment
Payment methodsCash
Acceptance of requestsclosed
Project description
Implementation of executive schemes based on the project is required.
Control measurements of the geometry of the structure.
Removal of defecation and construction overlay
Control measurements of the geometry of the structure.
Removal of defecation and construction overlay