
1
Андрей
no recommendations
no complaints
Project title: A feasibility study for construction is required
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2025-01-15 until 2025-01-25
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer
Acceptance of requests: from 2025-01-15 until 2025-01-25
Project description:
Offering of earnings for a specialist in drawing up an economic justification for construction. A feasibility study is required for the construction of a quarry on a horizontal deposit (Micromine).
1. Make calculations (example is available)
2. Building careers, etc. (Example is available)
I will send the remaining files by mail, examples of dump quarry, etc. All of it is, but it's over 500 MB in volume.
Offering of earnings for a specialist in drawing up an economic justification for construction. A feasibility study is required for the construction of a quarry on a horizontal deposit (Micromine).
1. Make calculations (example is available)
2. Building careers, etc. (Example is available)
I will send the remaining files by mail, examples of dump quarry, etc. All of it is, but it's over 500 MB in volume.
Attached files:
Attached files are available only to Freelancers and the project author
Attached files are available only to Freelancers and the project author