A feasibility study for construction is required

Employer
[no-member:pro]Andrey[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Jan 15, 2025 until Jan 25, 2025
Project description
Offering of earnings for a specialist in drawing up an economic justification for construction. A feasibility study is required for the construction of a quarry on a horizontal deposit (Micromine).
1. Make calculations (example is available)
2. Building careers, etc. (Example is available)
I will send the remaining files by mail, examples of dump quarry, etc. All of it is, but it's over 500 MB in volume.
1. Make calculations (example is available)
2. Building careers, etc. (Example is available)
I will send the remaining files by mail, examples of dump quarry, etc. All of it is, but it's over 500 MB in volume.
Attached files
Files are available only to Freelancers and the project author