
1
Вячеслав
no recommendations
no complaints
Project title: Development of air supply project documentation
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer
Acceptance of requests: from 2024-01-08 until 2024-01-23
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: prepayment is possible
Payment methods: Cash, Bank transfer
Acceptance of requests: from 2024-01-08 until 2024-01-23
Project description:
Offering remote work. Documentation of the air supply project (compressed air lines) is required. In the existing premises, new compressor equipment is installed (a total of 44 units), according to the existing layouts of the premises with equipment placement marks, it is required to develop design documentation for laying a compressed air line on existing or new structures from compressors to equipment, the working pressure of lines 10, 25, 40 bar.
Work documentation is required, including sections:
Section 1. "Explanatory Note";;
Section 2. "Constructive and space-planning solutions";
Section 3. "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions";
(A) subsection "Air supply";
B) subsection "Technological solutions";
Section 5. "Project of production of works";;
Section 6. "List of measures for labor protection";;
Section 7. "Measures to ensure fire safety";;
At the beginning of the work, a joint visit to the facility (Moscow) is required to determine the routes of the laying (all costs are paid).
Offering remote work. Documentation of the air supply project (compressed air lines) is required. In the existing premises, new compressor equipment is installed (a total of 44 units), according to the existing layouts of the premises with equipment placement marks, it is required to develop design documentation for laying a compressed air line on existing or new structures from compressors to equipment, the working pressure of lines 10, 25, 40 bar.
Work documentation is required, including sections:
Section 1. "Explanatory Note";;
Section 2. "Constructive and space-planning solutions";
Section 3. "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions";
(A) subsection "Air supply";
B) subsection "Technological solutions";
Section 5. "Project of production of works";;
Section 6. "List of measures for labor protection";;
Section 7. "Measures to ensure fire safety";;
At the beginning of the work, a joint visit to the facility (Moscow) is required to determine the routes of the laying (all costs are paid).
Attached files:
Attached files are available only to Freelancers and the project author
Attached files are available only to Freelancers and the project author