Development of air supply project documentation

Employer
[no-member:pro]Vyacheslav[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Jan 8, 2024 until Jan 23, 2024
Project description
Offering remote work. Documentation of the air supply project (compressed air lines) is required. In the existing premises, new compressor equipment is installed (a total of 44 units), according to the existing layouts of the premises with equipment placement marks, it is required to develop design documentation for laying a compressed air line on existing or new structures from compressors to equipment, the working pressure of lines 10, 25, 40 bar.
Work documentation is required, including sections:
Section 1. "Explanatory Note";;
Section 2. "Constructive and space-planning solutions";
Section 3. "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions";
(A) subsection "Air supply";
B) subsection "Technological solutions";
Section 5. "Project of production of works";;
Section 6. "List of measures for labor protection";;
Section 7. "Measures to ensure fire safety";;
At the beginning of the work, a joint visit to the facility (Moscow) is required to determine the routes of the laying (all costs are paid).
Work documentation is required, including sections:
Section 1. "Explanatory Note";;
Section 2. "Constructive and space-planning solutions";
Section 3. "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions";
(A) subsection "Air supply";
B) subsection "Technological solutions";
Section 5. "Project of production of works";;
Section 6. "List of measures for labor protection";;
Section 7. "Measures to ensure fire safety";;
At the beginning of the work, a joint visit to the facility (Moscow) is required to determine the routes of the laying (all costs are paid).
Attached files
Files are available only to Freelancers and the project author