BIM is required based on the existing project

Дмитрий
1

Дмитрий

no recommendations
no complaints
Project title: BIM is required based on the existing project
Type of cooperation: One-time project
Section: Engineering. Drawings
Prepayment: without prepayment
Payment methods: Bank transfer, Electronic money
Acceptance of requests: from until 2021-04-24

Project description:
Offering extra earnings. You need to create a BIM based on the existing project. The existing project has developed reinforcement on reinforced concrete support clip. The supports that are planned to be strengthened are all different, differ only in the height of the clip and the width of the foundation. When changing two parameters (the height of the clip and the width of the foundation), the drawings and recalculations of the specifications should be changed.
Project author
Дмитрий