BIM is required based on the existing project

Employer
[no-member:pro]Dmitry[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer, Electronic money
Acceptance of requestsfrom Apr 14, 2021 until Apr 24, 2021
Project description
Offering extra earnings. You need to create a BIM based on the existing project. The existing project has developed reinforcement on reinforced concrete support clip. The supports that are planned to be strengthened are all different, differ only in the height of the clip and the width of the foundation. When changing two parameters (the height of the clip and the width of the foundation), the drawings and recalculations of the specifications should be changed.