Project title: Design and engineering survey
Type of cooperation: Periodic employment
Section: Other / Miscellaneous
Prepayment: without prepayment
Acceptance of requests: closed

Project description:
For the project of cleaning the territory for the planned road network, it is planned to demolish existing buildings and engineering networks.
Constructive:
The main points:
- number of buildings - all falling into the attached geosubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubs Volume approximately 70 t. m3;
- survey required in a lightweight version without resource-intensive calculations;
- we need a piece of pits, because The demolition will be done with the excavation of the foundations. For a small building, you can 1 screw, for a large 1 or 2 (includes types of f-ts);
- drawings with designation of the construct (plans, cut), plan of covering of the floor, plan of foundations, pits, everything is schematic.
- according to the technical condition, we focus on emergency areas and emergency groups of the construct;
- Tzk among other things d. Contain specifications of the dismantled elements with their parametric characteristics m3, tons, etc.

Engineer:
Required:
- network surveys are required in a lightweight version, i.e. In the format of applying networks to drawings, and placing networks in drawings.
- With the preparation of specifications of dismantled elements with indication of parametric characteristics. The interior is being dismantled on buildings + outdoor liner to existing buildings. The highways remain;
Address in the dwg
Deadline. 20 days for everything.
In the first two or three days, you need to make a pilot project for one object with a prepaid 30%, we will discuss the details at a meeting at the facility.