Design and engineering survey

Employer
[no-member:pro]Pavel[/no-member:pro]Pavel
Project parameters
Type of cooperationPeriodic employment
SectionOther / Miscellaneous
Prepaymentwithout prepayment
Acceptance of requestsclosed
Project description
For the project of cleaning the territory for the planned road network, it is planned to demolish existing buildings and engineering networks.
Constructive:
The main points:
- number of buildings - all falling into the attached geosubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubs Volume approximately 70 t. m3;
- survey required in a lightweight version without resource-intensive calculations;
- we need a piece of pits, because The demolition will be done with the excavation of the foundations. For a small building, you can 1 screw, for a large 1 or 2 (includes types of f-ts);
- drawings with designation of the construct (plans, cut), plan of covering of the floor, plan of foundations, pits, everything is schematic.
- according to the technical condition, we focus on emergency areas and emergency groups of the construct;
- Tzk among other things d. Contain specifications of the dismantled elements with their parametric characteristics m3, tons, etc.
Engineer:
Required:
- network surveys are required in a lightweight version, i.e. In the format of applying networks to drawings, and placing networks in drawings.
- With the preparation of specifications of dismantled elements with indication of parametric characteristics. The interior is being dismantled on buildings + outdoor liner to existing buildings. The highways remain;
Address in the dwg
Deadline. 20 days for everything.
In the first two or three days, you need to make a pilot project for one object with a prepaid 30%, we will discuss the details at a meeting at the facility.
Constructive:
The main points:
- number of buildings - all falling into the attached geosubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubsubs Volume approximately 70 t. m3;
- survey required in a lightweight version without resource-intensive calculations;
- we need a piece of pits, because The demolition will be done with the excavation of the foundations. For a small building, you can 1 screw, for a large 1 or 2 (includes types of f-ts);
- drawings with designation of the construct (plans, cut), plan of covering of the floor, plan of foundations, pits, everything is schematic.
- according to the technical condition, we focus on emergency areas and emergency groups of the construct;
- Tzk among other things d. Contain specifications of the dismantled elements with their parametric characteristics m3, tons, etc.
Engineer:
Required:
- network surveys are required in a lightweight version, i.e. In the format of applying networks to drawings, and placing networks in drawings.
- With the preparation of specifications of dismantled elements with indication of parametric characteristics. The interior is being dismantled on buildings + outdoor liner to existing buildings. The highways remain;
Address in the dwg
Deadline. 20 days for everything.
In the first two or three days, you need to make a pilot project for one object with a prepaid 30%, we will discuss the details at a meeting at the facility.