Closed project management system

Employer
[no-member:pro]Aleksandr[/no-member:pro]Aleksandr
Project parameters
Type of cooperationPeriodic employment
SectionWeb development
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsclosed
Project description
Frontend developer on angularjs
1. There is a project to create a project management system )
2. The delivery time of 2 subsystems is 14.07: the 1st is almost ready, with the second effect aiming for 0.
3. The backend for the second is realized at 90%. There are designs and examples of basic interfaces.
Task: to connect to the project and jointly implement the subsystem from Frontend.
Date of completion of the work of the contractor: no later than 14.07.2015
In case of successful cooperation – continuation of work on this and other projects (mainly much more interesting than the business card site)
1. There is a project to create a project management system )
2. The delivery time of 2 subsystems is 14.07: the 1st is almost ready, with the second effect aiming for 0.
3. The backend for the second is realized at 90%. There are designs and examples of basic interfaces.
Task: to connect to the project and jointly implement the subsystem from Frontend.
Date of completion of the work of the contractor: no later than 14.07.2015
In case of successful cooperation – continuation of work on this and other projects (mainly much more interesting than the business card site)