It is necessary to perform the ROM section for the construction of a block boiler house. The size of the boiler room in terms of 12000 x 3200. On each side of the boiler house will be a pavement width of 1m. The project provides a turning point to the north of the boiler house (in principle, it is there and now), the entrance of the fire truck at a distance of 3-5 (according to the joint venture) meters from the boiler house on its long side. The buildings of the "MN" on each of the long sides of the boiler house are dismantled.