Processing of the IDF

Employer
Vladimir
Project parameters
Type of cooperationPeriodic employment
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Oct 6, 2025 until Oct 21, 2025
Project description
The services of a specialist in the design of CMD are required. It is required to design the CMD for the AA with adjustments. To sign with the customer.