Calculate the framework basis for sustainability

Employer
[no-member:pro]Maksim[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsBank transfer
Acceptance of requestsfrom Oct 10, 2024 until Oct 15, 2024
Project description
Offering remote work. It is necessary to count on the stability, the mounting frame, which is a temporary flooring base for installing the overall metal structure. Fixing the structure to the frame on the bolts.