Development of a thyristor converter

Employer
[no-member:pro]Igor[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsBank transfer
Acceptance of requestsfrom Jul 21, 2023 until Jul 26, 2023
Project description
Offering remote work. A thyristor converter control system with a single-channel SIFU based on the MK is needed.
It is necessary to implement an algorithm based on a specific MK. Also include functional and structural schemes + bring the code on assembly
It is necessary to implement an algorithm based on a specific MK. Also include functional and structural schemes + bring the code on assembly