Designing the furnace

Employer
[no-member:pro]Aleksey[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentwithout prepayment
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Apr 29, 2023 until May 14, 2023
Project description
The services of a stove designer are required. It requires the design of a gas-filled rotating tubular electric furnace.