Remote work for a drawing specialist. We need plans for fire equipment.
1. Prepare a drawing of the general view of the Hydrant indicating the connection to the fire water supply through the transition flange
2. Prepare drawings of a general form:
a. SPC in closed form with a transition flange 50 mm mounted on the support.
i. Indicate the bolts of the mounting of the SPC to the support - M10x30
ii. Support anchors to floor M8 x 80
iii. Add a drawing (simplified, no dimensions) of the fire barrel and sleeve with 2 GM
b. Transition flange 50 + PDA 50 + GM-50
c. Transition flange 65 + PDA 65 + GM-65
3. Transition flange 50 + PDA 50 + GM-50 + GZ-50
4. Transition flange 80 + GM-80 + GZ-80
Source information, drawings and drawings - in files by numbers. In 2 separate files – sketches with customer comments and additional technical information.
1. Prepare a drawing of the general view of the Hydrant indicating the connection to the fire water supply through the transition flange
2. Prepare drawings of a general form:
a. SPC in closed form with a transition flange 50 mm mounted on the support.
i. Indicate the bolts of the mounting of the SPC to the support - M10x30
ii. Support anchors to floor M8 x 80
iii. Add a drawing (simplified, no dimensions) of the fire barrel and sleeve with 2 GM
b. Transition flange 50 + PDA 50 + GM-50
c. Transition flange 65 + PDA 65 + GM-65
3. Transition flange 50 + PDA 50 + GM-50 + GZ-50
4. Transition flange 80 + GM-80 + GZ-80
Source information, drawings and drawings - in files by numbers. In 2 separate files – sketches with customer comments and additional technical information.