Perform pre-project work

Employer
[no-member:pro]Viktor[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsBank transfer
Acceptance of requestsfrom Jun 20, 2022 until Jun 25, 2022
Project description
Offering remote work. It is necessary to perform pre-design study of the TX of the administrative and household building during production. Locker rooms, showers, med., dryer s/o. Security post.
2 floors. Approximate dimensions of the building 40x15(18)x6.6
Model in Revit + drawings.
Requirements: compliance of FZ 123 decisions with the current joint venture and SanPin
2 floors. Approximate dimensions of the building 40x15(18)x6.6
Model in Revit + drawings.
Requirements: compliance of FZ 123 decisions with the current joint venture and SanPin