Programmer services are required. You need to create a program for the Siemens S7-1200 PLC using the SCL and LAD programming language, which will control the lighting of the building.
The requirements are as follows:
• 3 floors.
• When pressing the switch, it must turn on the lighting of the floor on which it was pressed.
• The lights remain on for 10 minutes.
• Lights on each floor can only be turned on 100 times a day.
Lights can only be turned on at night (use a light sensor)
• Day to day (every 24 hours) discharge 100 times.
• A maintenance switch (floor cleaning) that turns on light on all floors but does not count 100 times.
• Once you reach the switch limit 100 times a day, the lights should not be turned on.
• During the daytime, the light shall not be lit when the switch is pressed.
The requirements are as follows:
• 3 floors.
• When pressing the switch, it must turn on the lighting of the floor on which it was pressed.
• The lights remain on for 10 minutes.
• Lights on each floor can only be turned on 100 times a day.
Lights can only be turned on at night (use a light sensor)
• Day to day (every 24 hours) discharge 100 times.
• A maintenance switch (floor cleaning) that turns on light on all floors but does not count 100 times.
• Once you reach the switch limit 100 times a day, the lights should not be turned on.