Development of projects in the Furniture Base

Employer
[no-member:pro]Maksim[/no-member:pro]
Project parameters
Type of cooperationOn a permanent basis
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsBank transfer
Acceptance of requestsfrom Jul 10, 2021 until Jul 13, 2021
Project description
Need a specialist in the development of project documentation for the manufacture of furniture in the Furniture Basis. Outsourcing is required, orders are permanent.
I wonder how much it will cost to develop such a cabinet.
Also time to complete the order.
You need a model in 8 basis and above, separately drawings, if there are milled parts. A list of fittings.
I wonder how much it will cost to develop such a cabinet.
Also time to complete the order.
You need a model in 8 basis and above, separately drawings, if there are milled parts. A list of fittings.