Technical re-equipment of the smoke removal system

Employer
[no-member:pro]Valery[/no-member:pro]
Project parameters
Type of cooperationOne-time project
SectionEngineering. Drawings
Prepaymentprepayment is possible
Payment methodsCash, Bank transfer
Acceptance of requestsfrom Oct 14, 2020 until Oct 24, 2020
Project description
Offering additional income on the Internet. It is necessary to perform a technical re-equipment of the smoke removal system.
1. to perform in full measurement work on the existing designs of the smoke and air supply system.
2. Based on measurement work to develop RD for the reconstruction of smoke ducts of sectional thermal furnace with the installation of a recuperator (model known, installation site agreed)
3. It is necessary to perform sections: air supply, smoke removal and thermal insulation of equipment and pipelines.
1. to perform in full measurement work on the existing designs of the smoke and air supply system.
2. Based on measurement work to develop RD for the reconstruction of smoke ducts of sectional thermal furnace with the installation of a recuperator (model known, installation site agreed)
3. It is necessary to perform sections: air supply, smoke removal and thermal insulation of equipment and pipelines.