Good afternoon.
Offering remote earnings. We need to calculate the cost of the fence. It is required to schedule the consumption of materials for each section of the fence by the decree of Moscow No. 299 of May 19, 2015. Sections come in two types of 2 and 2.4 meters. Name of products that require miscalculation:
1AP
1Apc without lighting
1AP without supports
1AP without supports and lighting
1Ap 2 meters
1Ap without lighting 2 meters
1AP without supports 2 meters
1AP without supports and lighting 2 meters
1AN (1)
1AN (1) without illumination
1AN (1) 2 meters
1AN (1) without illumination 2 meters
1BBP
1BB without lighting
1BBP 2 meters
1BB without lighting 2 meters
1BN(2)
1BN(2) 2 meters
2AP
2Apc without lighting
2Apblock 2 meters
2Apr without lighting block 2 meters
2AN(1) punchline
2AN(1) punchboard without lighting
2AN(1) profile
2AN(1) Profile without lighting
2AN(1) punched block 2 meters
2AN(1) punched without lighting block 2 meters
2AN(1) Profile block 2 meters
2AN(1) Profile without lighting block 2 meters
2BRP
2BB without lighting
2BB block 2 meters
2bps without lighting block 2 meters
2BN(1)
2BN(1) without illumination
2BN(1) block 2 meters
2BN(1) without lighting block 2 meters
2BN(2)
2BN(2) without illumination
2BN(2) block 2 meters
2BN(2) without lighting 2 meters block
2GDP
2VP without lighting
2VB block 2 meters
2VP without lighting block 2 meters
3AP 1 row of blocks
3AP 1 row of blocks without a visor and lighting
3AP 1 row of blocks block 2 meters
3AP 1 row of blocks without a visor and lighting block 2 meters
3AP 2 series of blocks
3AP 2 series of blocks with a visor from the grid
3AP 2 series of blocks block 2 meters
3AP 2 row of blocks with a visor from a grid block 2 meters
3 AN 1 row of blocks
3 AN 2 series of blocks
3 AN 1 row blocks block 2 meters
3 AN 2 row blocks block 2 meters
3BB
3BB without lighting
3BB block 2 meters
3BB without lighting block 2 meters
3BN(1) punchboard
3BN(1) profile
3BN(2) smooth sheet
3BN(3) polycarbonate 2mm
3VP without additions
3VP anchorage
3VP with anchor in full configuration
3VP with supports and clamping unit in full configuration
3VP without additions with a canopy from the grid
3VP on anchor anchoring with a net visor
3VP with anchor in full configuration with a visor from the grid
3VP with supports and a clamping unit in full configuration with a visor from the grid
3VP with a back wall of a profile
3VP with a back wall of a profile sheet with a snare
Products differ from each other in small modifications and length, materials are often repeated.
Please immediately indicate the cost of miscalculation and the deadline for the work.
Offering remote earnings. We need to calculate the cost of the fence. It is required to schedule the consumption of materials for each section of the fence by the decree of Moscow No. 299 of May 19, 2015. Sections come in two types of 2 and 2.4 meters. Name of products that require miscalculation:
1AP
1Apc without lighting
1AP without supports
1AP without supports and lighting
1Ap 2 meters
1Ap without lighting 2 meters
1AP without supports 2 meters
1AP without supports and lighting 2 meters
1AN (1)
1AN (1) without illumination
1AN (1) 2 meters
1AN (1) without illumination 2 meters
1BBP
1BB without lighting
1BBP 2 meters
1BB without lighting 2 meters
1BN(2)
1BN(2) 2 meters
2AP
2Apc without lighting
2Apblock 2 meters
2Apr without lighting block 2 meters
2AN(1) punchline
2AN(1) punchboard without lighting
2AN(1) profile
2AN(1) Profile without lighting
2AN(1) punched block 2 meters
2AN(1) punched without lighting block 2 meters
2AN(1) Profile block 2 meters
2AN(1) Profile without lighting block 2 meters
2BRP
2BB without lighting
2BB block 2 meters
2bps without lighting block 2 meters
2BN(1)
2BN(1) without illumination
2BN(1) block 2 meters
2BN(1) without lighting block 2 meters
2BN(2)
2BN(2) without illumination
2BN(2) block 2 meters
2BN(2) without lighting 2 meters block
2GDP
2VP without lighting
2VB block 2 meters
2VP without lighting block 2 meters
3AP 1 row of blocks
3AP 1 row of blocks without a visor and lighting
3AP 1 row of blocks block 2 meters
3AP 1 row of blocks without a visor and lighting block 2 meters
3AP 2 series of blocks
3AP 2 series of blocks with a visor from the grid
3AP 2 series of blocks block 2 meters
3AP 2 row of blocks with a visor from a grid block 2 meters
3 AN 1 row of blocks
3 AN 2 series of blocks
3 AN 1 row blocks block 2 meters
3 AN 2 row blocks block 2 meters
3BB
3BB without lighting
3BB block 2 meters
3BB without lighting block 2 meters
3BN(1) punchboard
3BN(1) profile
3BN(2) smooth sheet
3BN(3) polycarbonate 2mm
3VP without additions
3VP anchorage
3VP with anchor in full configuration
3VP with supports and clamping unit in full configuration
3VP without additions with a canopy from the grid
3VP on anchor anchoring with a net visor
3VP with anchor in full configuration with a visor from the grid
3VP with supports and a clamping unit in full configuration with a visor from the grid
3VP with a back wall of a profile
3VP with a back wall of a profile sheet with a snare
Products differ from each other in small modifications and length, materials are often repeated.
Please immediately indicate the cost of miscalculation and the deadline for the work.